Teva CFS Book English
Leading the Way the plant starts at the visitors gallery, where a large screen was installed that screens a brief film about the plant. As you know, you don’t get a second chance to make a first impression and looking at the warehouse in action is a real “WOW” experience for the visitors. Aiming high - 27 meters of progress Construction lasted two years, during which time the plant warehouse underwent numerous changes: a lot of shelving was disassembled, and the people in the department were forced to cope with reduced storage space, which was minimal to begin with, but it was all for the best. The new warehouse was built on the eastern side of the site, as a tall and impressive building that rose to a height of 27 meters. Once the automatic warehouse became operational, the area of the old warehouse underwent a huge makeover. The department’s work environment was given a real makeover; more operational space was made that made it possible to perform all the logistic activities in a spacious manner, offices for the different functionaries were built, and for the first time in a decade - all the department employees were in one building. Moreover, a potent sampling room was built at a high, state of the art standard. In 2011, construction of the automatic warehouse was completed, to everyone’s delight. Since then, the warehouse has been faithfully and efficiently serving the plant and suits the requirements of the times. ◄ New versus old: The new automatic warehouse ▼ The old warehouse ▲ The old warehouse - from right to left, Alex Lafushner, Arie Davidovich, Azriel Machpud ▲ The old warehouse - in the photo, Eli Shoval 25
Made with FlippingBook
RkJQdWJsaXNoZXIy NTc3NzU=